Data Center Equipment Supply and Relocation Services

Challenges You Are Facing

  • Poor data centre cooling: hot spots shorten equipment life and cause intermittent outages.
  • Uptime falling short: the 99.9% SLA is frequently on the verge of being breached.
  • Relocation downtime risk: the worry of business disruption for days during a move.
  • Insufficient room to expand: racks are full and there is nowhere to place new servers.
  • Co-location versus building your own: unsure which option suits you.
  • ESG reporting pressure: unfavourable PUE figures make it hard to meet ESG requirements.

C2 Solution

Data centre design: layout, rack placement, cabling path and cooling zone planning.

Equipment supply:

  • Server Rack: 42U / 45U / 48U, 800mm / 1000mm / 1200mm deep.
  • PDU: Basic / Metered / Switched, single-phase and three-phase.
  • UPS: 1kVA to 500kVA, double-conversion online.
  • Cooling: in-row AC, rear-door heat exchanger, hot aisle containment.
  • Structured Cabling: Cat 6A / Cat 8 / OM4 fibre.

Relocation services:

  • Pre-relocation audit (asset list + dependency map)
  • Relocation plan (sequence + fallback)
  • Cutover day (weekend / early-morning window)
  • Post-move validation
  • Old data centre decommissioning

Other optimisations:

  • PUE optimisation: assessment and improvement recommendations, typically reducing PUE by 0.3–0.5.
  • Green DC certification support: Uptime Tier III / LEED / BEAM Plus.

Who It Suits


Business Type Use Case
Financial institutions In-house DC, co-location, HKMA compliance
Telecoms / ISPs Network data centres, edge DC
Cloud service providers Co-location, HCI cluster
Government / public bodies Government DC, open tender
Large-scale manufacturing / logistics In-house edge DC
Co-location clients Moving in / out of colocation

Service Process

  1. Site survey (room size / power / cooling)
  2. DC design diagram + layout
  3. Equipment BoM quotation
  4. Installation day (rack + PDU + UPS + cabling)
  5. Cooling + power testing
  6. Relocation day (cutover sequence)
  7. Post-move testing
  8. Old data centre decommissioning + ESG certificate

Supported Brands


Category Brand
Server Rack Vertiv, Rittal, APC by Schneider, Tripp Lite, Huawei
PDU APC, Vertiv, Raritan, Eaton, CyberPower
UPS Vertiv Liebert, APC Smart-UPS, Eaton 9PX/9SX, Huawei, Delta
In-row / Rack Cooling Vertiv, Schneider, Rittal, Huawei
Generator Caterpillar, Cummins, MTU, Perkins
Structured Cabling Panduit, CommScope, Siemon, Leviton
DCIM Software Vertiv, Schneider EcoStruxure, Sunbird DCIM

Warranty and After-Sales

  • UPS 1–3 year warranty: includes VRLA batteries, or extended lithium-battery warranty.
  • Rack / PDU 1–5 year warranty: structural warranty.
  • Cooling systems: 1–3 year warranty + quarterly PM (dust cleaning, refrigerant check).
  • Relocation services: 30-day post-move warranty (handling damage excluded).
  • 24x7 emergency support: contracts available for large clients.

FAQ

How can downtime be reduced?
Phased relocation + parallel run + weekend cutover, with at least 2 cutover fallbacks prepared.

How is a UPS sized?
Total load (kW) x 1.2 ÷ UPS efficiency, plus the target battery runtime (typically 15–30 minutes).

How do we choose a cooling solution?
Air cooling is sufficient below 5kW per rack; use in-row for 5–15kW; use rear-door or liquid cooling above 15kW.

Physical DC or public cloud?
For compliance requirements, more than 5 PB of data or long-term workloads, physical is recommended; for short-term or burst needs, use the cloud.

How is PUE improved?
Hot / cold aisle containment + in-row cooling + UPS efficiency upgrade can typically bring PUE down from 1.8 to 1.3.

How much preparation does a relocation need?
Under 50 racks: 3 months of planning is recommended; over 50 racks: 6 months.


Case Studies


Case A — Data center relocation of 10 racks for a financial firm

A local securities firm's old data centre had poor cooling and unstable power and needed relocating to a new colocation facility. C2 provided a full audit + relocation sequence + weekend cutover + 2-week parallel run, with equipment including Vertiv SmartAisle, APC UPS and Panduit cabling. After 3 months of planning, the relocation of 10 racks was completed over a single weekend. Result: total downtime under 4 hours, with zero business impact.

Case B — PUE optimisation for a co-location client

A co-location client with 30 racks had a PUE of 2.1. C2 provided hot aisle containment + in-row cooling + APC UPS upgrade + DCIM monitoring, implemented in phases over 3 months. Result: PUE fell from 2.1 to 1.4, saving HKD 1.8 million in electricity costs per year, with a clear improvement in ESG reporting.


Get a Quote

Want a quote for DC equipment or relocation? Provide the room size, rack count and workload type for a reply within 1 week with a layout, BoM and relocation plan. On-site surveys and sample layout walkthroughs are supported.