Data Center Equipment Supply and Relocation Services
Challenges You Are Facing
- Poor data centre cooling: hot spots shorten equipment life and cause intermittent outages.
- Uptime falling short: the 99.9% SLA is frequently on the verge of being breached.
- Relocation downtime risk: the worry of business disruption for days during a move.
- Insufficient room to expand: racks are full and there is nowhere to place new servers.
- Co-location versus building your own: unsure which option suits you.
- ESG reporting pressure: unfavourable PUE figures make it hard to meet ESG requirements.
C2 Solution
Data centre design: layout, rack placement, cabling path and cooling zone planning.
Equipment supply:
- Server Rack: 42U / 45U / 48U, 800mm / 1000mm / 1200mm deep.
- PDU: Basic / Metered / Switched, single-phase and three-phase.
- UPS: 1kVA to 500kVA, double-conversion online.
- Cooling: in-row AC, rear-door heat exchanger, hot aisle containment.
- Structured Cabling: Cat 6A / Cat 8 / OM4 fibre.
Relocation services:
- Pre-relocation audit (asset list + dependency map)
- Relocation plan (sequence + fallback)
- Cutover day (weekend / early-morning window)
- Post-move validation
- Old data centre decommissioning
Other optimisations:
- PUE optimisation: assessment and improvement recommendations, typically reducing PUE by 0.3–0.5.
- Green DC certification support: Uptime Tier III / LEED / BEAM Plus.
Who It Suits
| Business Type | Use Case |
|---|---|
| Financial institutions | In-house DC, co-location, HKMA compliance |
| Telecoms / ISPs | Network data centres, edge DC |
| Cloud service providers | Co-location, HCI cluster |
| Government / public bodies | Government DC, open tender |
| Large-scale manufacturing / logistics | In-house edge DC |
| Co-location clients | Moving in / out of colocation |
Service Process
- Site survey (room size / power / cooling)
- DC design diagram + layout
- Equipment BoM quotation
- Installation day (rack + PDU + UPS + cabling)
- Cooling + power testing
- Relocation day (cutover sequence)
- Post-move testing
- Old data centre decommissioning + ESG certificate
Supported Brands
| Category | Brand |
|---|---|
| Server Rack | Vertiv, Rittal, APC by Schneider, Tripp Lite, Huawei |
| PDU | APC, Vertiv, Raritan, Eaton, CyberPower |
| UPS | Vertiv Liebert, APC Smart-UPS, Eaton 9PX/9SX, Huawei, Delta |
| In-row / Rack Cooling | Vertiv, Schneider, Rittal, Huawei |
| Generator | Caterpillar, Cummins, MTU, Perkins |
| Structured Cabling | Panduit, CommScope, Siemon, Leviton |
| DCIM Software | Vertiv, Schneider EcoStruxure, Sunbird DCIM |
Warranty and After-Sales
- UPS 1–3 year warranty: includes VRLA batteries, or extended lithium-battery warranty.
- Rack / PDU 1–5 year warranty: structural warranty.
- Cooling systems: 1–3 year warranty + quarterly PM (dust cleaning, refrigerant check).
- Relocation services: 30-day post-move warranty (handling damage excluded).
- 24x7 emergency support: contracts available for large clients.
FAQ
How can downtime be reduced?
Phased relocation + parallel run + weekend cutover, with at least 2 cutover fallbacks prepared.
How is a UPS sized?
Total load (kW) x 1.2 ÷ UPS efficiency, plus the target battery runtime (typically 15–30 minutes).
How do we choose a cooling solution?
Air cooling is sufficient below 5kW per rack; use in-row for 5–15kW; use rear-door or liquid cooling above 15kW.
Physical DC or public cloud?
For compliance requirements, more than 5 PB of data or long-term workloads, physical is recommended; for short-term or burst needs, use the cloud.
How is PUE improved?
Hot / cold aisle containment + in-row cooling + UPS efficiency upgrade can typically bring PUE down from 1.8 to 1.3.
How much preparation does a relocation need?
Under 50 racks: 3 months of planning is recommended; over 50 racks: 6 months.
Case Studies
Case A — Data center relocation of 10 racks for a financial firm
A local securities firm's old data centre had poor cooling and unstable power and needed relocating to a new colocation facility. C2 provided a full audit + relocation sequence + weekend cutover + 2-week parallel run, with equipment including Vertiv SmartAisle, APC UPS and Panduit cabling. After 3 months of planning, the relocation of 10 racks was completed over a single weekend. Result: total downtime under 4 hours, with zero business impact.
Case B — PUE optimisation for a co-location client
A co-location client with 30 racks had a PUE of 2.1. C2 provided hot aisle containment + in-row cooling + APC UPS upgrade + DCIM monitoring, implemented in phases over 3 months. Result: PUE fell from 2.1 to 1.4, saving HKD 1.8 million in electricity costs per year, with a clear improvement in ESG reporting.
Get a Quote
Want a quote for DC equipment or relocation? Provide the room size, rack count and workload type for a reply within 1 week with a layout, BoM and relocation plan. On-site surveys and sample layout walkthroughs are supported.