Server Configuration and Procurement

Challenges You Are Facing

  • Insufficient VM capacity: VMware / Hyper-V resources are saturated, so new projects cannot be started.
  • Insufficient storage IOPS: slow database queries directly affect business operations.
  • Localisation compliance requirements: finance, healthcare and government sectors cannot migrate fully to the public cloud.
  • Old servers out of warranty: hard drive failures are becoming frequent.
  • Opaque TCO: the total cost of hardware, warranty, power and cooling lacks a clear calculation.
  • Hard to choose between HCI and traditional architecture: wanting to modernise but unsure where to start.

C2 Solution

Full range of models covered:

  • Tower: 1–2 CPUs, suited to branch offices and SMEs.
  • Rack: 1U / 2U / 4U, mainstream data centre configuration.
  • HCI (hyper-converged): Nutanix, HPE SimpliVity, Dell VxRail.
  • GPU Server: dedicated to AI / ML workloads (see Service Four).

Value-added services:

  • Sizing service: precise configurations calculated from VM count, storage IOPS and network throughput.
  • PoC support: 30-day PoC test machines available for large projects.
  • Factory pre-load: hypervisor (VMware ESXi / Proxmox / Hyper-V) and management agent pre-loaded before shipment.
  • Rack integration: PDU, switch and cabling quoted together.

Who It Suits


Business Type Use Case
SME ERP 50–200 staff, core business systems
Finance / securities firms Localisation of compliance and trading systems
Schools / universities SIS, email and research workloads
Healthcare HIS, PACS (requiring local storage and encryption)
Cloud service providers / MSPs Co-location and HCI clusters
Government / public bodies Open tender + ESG


Service Process

  1. Workload assessment (CPU / RAM / Storage / IOPS)
  2. Sizing document (including 5-year TCO calculation)
  3. Quotation + model comparison table
  4. PoC (if required, 30-day testing)
  5. Order confirmation + pre-load
  6. On-site data centre installation (rack + cabling + power check)
  7. Hypervisor + VM go-live testing
  8. Enter warranty + quarterly maintenance (PM)


Supported Brands


Brand Key Series Positioning
HPE ProLiant DL series (Gen11), Apollo, Synergy Mainstream enterprise
Dell PowerEdge R series, R760, R660 Enterprise + HCI
Lenovo ThinkSystem SR / SR650, ST series Strong value for money, global SKU
Supermicro SYS-1029 / 2029 series ODM / customised
Cisco UCS B / C series Integrated with UCS Manager
Huawei FusionServer series Subject to export restrictions; available for individual projects


Warranty and After-Sales

  • Standard warranty: 3-year Next Business Day On-site (NBDoS).
  • Upgradeable: 5-year 24x7x4, on-site within 4 hours (parts included).
  • Proactive Care: automated HPE / Dell alerts, notified 30 days before a hard drive failure.
  • Pre-stocked parts: HPE / Dell / Lenovo RMA parts stocked locally in Hong Kong.
  • Quarterly maintenance: 4 preventive maintenance visits per year (dust cleaning, firmware update, log review).

FAQ


How is rack power demand calculated?
About 200W for 1 CPU, 400W for 2 and 800W for 4; a 30% headroom is recommended.

Should we choose cloud or on-premises?
For local compliance requirements, data retention beyond 3 years or more than 50 VMs, on-premises is recommended; for short-term or burst needs, use the cloud.

How is sizing carried out?
Provide the existing VM list and 3 months of resource usage; C2 submits a sizing report within 1 week.

How are old machines decommissioned?
On-site decommissioning, secure data wipe and an ESG certificate are provided.

How do we choose between HCI and traditional architecture?
Fewer than 10 nodes: HCI is recommended (simpler management); more than 20 nodes: traditional architecture + scale-out storage.

How is VMware licensing handled?
If the client supplies its own licence, C2 only handles pre-installation; new licences can be ordered on your behalf.


Success Stories


Case A — Compliance server upgrade for a local securities firm

A listed securities firm needed to localise its trading system and improve audit logs to meet HKMA regulatory requirements. C2 supplied 2 Dell PowerEdge R760 servers (active-active configuration) + VMware vSAN + syslog offloading, going live within 6 weeks and passing active-active failover testing. Result: 0 findings in the HKMA audit and 99.99% business continuity.

Case B — Central ERP server for a restaurant chain

A Hong Kong-style restaurant chain with 80 branches needed a central ERP and inventory system. C2 supplied 2 HPE ProLiant DL380 Gen11 servers (cluster) + 10GbE + cloud replication backup, completing data centre installation, cabling and failover testing, and going live within 3 weeks. Result: ERP response time fell from 5 seconds to 1.2 seconds.


Get a Quote

Need server sizing? Provide your workload list and C2 will submit a Sizing Report, a 5-year TCO estimate and an HCI / traditional architecture comparison within 1 week. Large projects support 30-day PoC testing on real hardware, with zero-risk evaluation.